1remodel480320-1

3 day bathroom remodel

My bathroom, before and after. I spent about 0 doing everything. http://www.facebook.com/franksg384 http://www.youtube.com/franksg384 http://gil-reallife….

remodel

Recommended Reads....


Please Share Us:
Votes 82

Rating: 3 out of 5

Updated: December 18, 2013 — 9:38 am

18 Comments

  1. Holy crap-apples, solid color.

  2. @vtwinbreed lol correct! thanks for watching!

  3. Nice Job!

  4. @DayWalker424 Thanks! Can I get a thumbs up! And thanks for watching!

  5. @Fancytuna1 I agree. I did this in a hurry because I wanted to surprise my
    wife while she was away. But I really wanted short curtains but couldn’t
    find them, and the long ones are a bit much. We may be swapping them out
    soon. Thanks for watching!

  6. Ewwww the before shot looks like 2 ppl were fighting over pepto bismal and
    it got viscus and blood splashed on the walls and the pepto residual was
    left behind. You did a good job cleaning that up 2 thumbs ups

  7. You what would really make it look nice that would be inexpensive get one
    og those roller curtains, lay it out and paint on it. Let it dry for 3 days
    then add it to the window and take the curtain down. I noticed you don’t
    have space for pictures, that’s ok thou this will and detail to your
    bathroom. Good job thou

  8. Three days, wow! What did you use to cut the crown moldings?

  9. Miter saw makes quick work of them. And the plastic angle blocks that you
    screw to your work bench are okay too. Thanks for watching and commenting!

  10. before = lots of fun on lsd.

  11. Agreed. I would do the tile, but it’s too expensive. Thanks for watching
    and commenting.

  12. Thanks for the kind words.

  13. OMGGGG!!! lol @ all my misspelling. I see I write as if I were talking,
    smh. What I was trying to say, if you get one of those roll up blinds,
    paint, and allow to dry 3 days. This would double as art and privacy when
    necessary. When your guest see it they will be amazed.

  14. kool effort but I would have gotten rid of that pink tile first. they have
    some stuff to paint the tile if you don’t want to replace it. then I would
    work on the floor. Tile can change the room 80%…but kool room,,oh and get
    rid of the toilet seat cover..thats so 80’s….still gets my thumb on work
    done.

  15. This is great..I just did a video on tissue papering walls…It was pretty
    cheap too! This is great, thanks for the inspiration

  16. Thanks for the kind words and for watching!

  17. Great job!

  18. THANKS!

Comments are closed.

Site Disclaimer: This site is designed for educational purposes only, if you click on a link and make a purchase I will make a small commission. Furthermore, all videos and photos on this site are provided by 3rd parties. We take no responsibility for the content on any website which we link to, please use your own discretion while surfing the links.

Frontier Theme

Enjoy this blog? Please spread the word :)