Finish Basement sq ft Building Fees Plan Check Fees Carport sq ft State Surcharge Garage sq ft Water Covered Porch sq ft Sewer Occ Group delta.utah.gov Applicant Name: Contact, if not applicant: Contact Phone Number: Contact Email: For City Use Only

6 Matt & Trisha Esplin Dale Dellamas 483 South 1800 East (Basement Finish) $6,420.00 0177-2012 TOTAL $34,320.00 Residential – New Twinhome/Duplex Contractor Address Valuation Permit # 1 Tri-Equity Builders Tri-Equity Builders 838 West 600 South #7PV $128,110.00 0180-2012

BASEMENT FINISH/REMODEL Please review this checklist and make sure you have all of the necessary or removed (this information needs to be wet stamped by a Utah State Licensed Structural Engineer) Information on doors, windows, or walls to be moved, removed, or added

MURRAY CITY RESIDENTIAL REMODEL, ADDITION, OR ATTACHED GARAGE ___ Basement plan (indicate finished or unfinished) sheathing, interior finish, weather barrier, and exterior finish ___ Floor joists and sheathing ___ Solid blocking

CONSTRUCTION WITHOUT A PERMIT addition or basement finish. The cost of the life-safety inspection is $42.00 per hour, including driving time. The amount of the life-safety inspections is credited against permit fees. ‘As-Built’ Construction page 2

Community Development Department Please print legibly and complete all areas: 55 Finish Basement Electrical Rough Basement Plumbing Carport Mechanical Garage stamped and dated by a Utah

Standard Questionnaire General Information Property Information Form PT-060 PT-060-1.ai Rev. 11/99 Property owner name Basement Crawl space 13. Percent of finish in basement Unfinished Full basement On concrete 15. Attic None Unfinished attic used as storage

Utah State Office of Education (USOE) October 10, 2013, Basement East Conference Room . Minutes . Attendees: Superintendent Dave Brotherson, Ivan Christensen, Dan Ellis, Murrell Martin, FY2014 with a finish line of FY2016 Superintendent Brotherson seconds it.

373 N. Matisse Lane Alpine, Utah 84004 Drussel Residence 373 N. Matisse Lane Alpine, Utah 84004 ABBREVIATION LEGEND # @ < ~ L AB. ABV. ADJ. AFF. A.I.A. ALUM. APPROX. ARCH. A.S.T.M BD. BASEMENT FINISH 1S 1J 1K 1 1 3 4 5 5 A A B B C D E 58' – 4" 29' – 0" 22' – 0" 7' – 4" 78' – 6"

Utah State Building Board MEETING March 10, 2010 MINUTES behalf of Division of Adult Probation and Parole, Department of Corrections and the then finish the roof, which would be about $60, 000, they decided the building wasn’t worth

General Contractor: Utah State Lic. # Address: Phone No. Electrical Contractor: Utah State Lic. # Address: Phone No. Plumbing Finish Basement Electrical Rough Basement Plumbing Carport/Garage Mechanical # Stories PLAN CHECK DEPOSIT PAID ( )

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/20/2009) PERMIT SUBMITAL CHECKLIST: Signed and completed Building Permit application form. 2 Copies of plans showing proposed layout and materials. Plans shall be drawn to scale

8/05 FINISHED SQUARE FOOTAGE It is important that REALTORS® be consistent in measuring the finished square footage of homes. Therefore, the following guidelines are provided to aid you in completing the square footage questions on the property

Application that we will talk about here became “fireblocking. basement), draftstoppingisn’t required. and the finish material would have to be draftstopped. Copyright © 2007 American Forest & Paper Association. 16

Utah Pupil Transportation Advisory Committee . Utah State Office of Education (USOE) with the districts. That allows the school district to replace two buses for the cost of one. We are not FY2014 with a finish line of FY2016 Superintendent Brotherson seconds it.

Campus Planning and Construction Project Delivery shannon.failner@fm.utah.edu Missy Tyrrell: 801-581-3134 Missy.tyrrell@fm.utah.edu . Projects * Please see slides below for more detail Christin Robbins 21591 Union Freezer Basement

CONSTRUCTION WITHOUT A PERMIT addition or basement finish. The cost of the life-safety inspection is $42.00 per hour, including driving time. The amount of the life-safety inspections is credited against permit fees. ‘As-Built’ Construction page 2

BUILDING PERMIT TOOELE CITY Finish Basement correct and are based upon my understanding of the Utah Construction Trades Licensing Act: 1. I am sole owner of the property and construction project at the above described location; 2.

Recommended Reads....


Please Share Us:
Votes 135

Rating: 4 out of 5

Updated: March 16, 2015 — 9:44 am

Site Disclaimer: This site is designed for educational purposes only, if you click on a link and make a purchase I will make a small commission. Furthermore, all videos and photos on this site are provided by 3rd parties. We take no responsibility for the content on any website which we link to, please use your own discretion while surfing the links.

Frontier Theme

Enjoy this blog? Please spread the word :)